Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills
FairDallas County, Texas · IH 35E/SH 190 Interchange · Structure no. 180570019603457
- Built
- 2001
- 24 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 764 ft
- 2 main spans
- Daily traffic
- 10,000
- 2011 count
- Owner
- Toll Authority
- Local Toll Authority
About this bridge
Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills is a steel continuous stringer/multi-beam or girder carrying Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills in Dallas County, Texas. It was built in 2001, so it is 24 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,000 vehicles a day, projected to reach 12,800 by 2031. The structure is 764 ft (232.9 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills built?
It was built in 2001, making it 24 years old in 2025.
What condition is Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills carry?
About 10,000 vehicles per day (2011 count).
How long is Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills?
The structure is 764 ft (232.9 m) long with a longest span of 190 ft (57.9 m) and a deck 38 ft wide.
Who owns Pgbt Wb/Ih 35E NB over IH35E Nbfr&trinity Mills?
It is owned by the Local Toll Authority.