US Bridges

Pgbt (SH190) DC04 over IH 30

Good

Dallas County, Texas · IH 30 / Pgbt Interchange · Structure no. 180570000911461

Built
2012
13 years old
Condition
Good
inspected April 2024
Type
Box Beam or Girders - Multiple
Steel Continuous
Length
3,326 ft
7 main spans
Daily traffic
148,088
2022 count
Owner
Toll Authority
Local Toll Authority

About this bridge

Pgbt (SH190) DC04 over IH 30 is a steel continuous box beam or girders - multiple carrying Pgbt (SH190) DC04 over IH 30 in Dallas County, Texas. It was built in 2012, so it is 13 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 148,088 vehicles a day, roughly 15% of them trucks, projected to reach 207,323 by 2042. The structure is 3,326 ft (1,013.8 m) long and 28 ft wide.

CarriesPgbt (SH190) DC04
CrossesIH 30
LocationIH 30 / Pgbt Interchange
RouteInterstate 190
StateTexas
Coordinates32.85417, -96.55953
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans7 (+21 approach)
Design loadHS 20
Structure length3,326 ft (1,013.8 m)
Longest span255 ft (77.7 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic148,088 (2022)
Projected traffic207,323 by 2042
Trucks15%
Lanes on structure1
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerLocal Toll Authority
Maintained byLocal Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pgbt (SH190) DC04 over IH 30 built?

It was built in 2012, making it 13 years old in 2025.

What condition is Pgbt (SH190) DC04 over IH 30 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.

How much traffic does Pgbt (SH190) DC04 over IH 30 carry?

About 148,088 vehicles per day (2022 count), of which roughly 15% are trucks.

How long is Pgbt (SH190) DC04 over IH 30?

The structure is 3,326 ft (1,013.8 m) long with a longest span of 255 ft (77.7 m) and a deck 28 ft wide.

Who owns Pgbt (SH190) DC04 over IH 30?

It is owned by the Local Toll Authority.