US Bridges

Main ST over Pecan Creek

Good

Cooke County, Texas · 0.4 MI W of FM 372 · Structure no. 030490B00550001

Built
2013
12 years old
Condition
Good
inspected April 2023
Type
Other
Prestressed Concrete
Length
122 ft
3 main spans
Daily traffic
1,080
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Main ST over Pecan Creek is a prestressed concrete other carrying Main ST over Pecan Creek in Cooke County, Texas. It was built in 2013, so it is 12 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,080 vehicles a day, roughly 5% of them trucks, projected to reach 2,500 by 2027. The structure is 122 ft (37.2 m) long and 36 ft wide.

CarriesMain ST
CrossesPecan Creek
Location0.4 MI W of FM 372
RouteCity Street 207
StateTexas
Coordinates33.62353, -97.13908
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length122 ft (37.2 m)
Longest span46 ft (14 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,080 (2020)
Projected traffic2,500 by 2027
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$467,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Main ST over Pecan Creek built?

It was built in 2013, making it 12 years old in 2025.

What condition is Main ST over Pecan Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Main ST over Pecan Creek carry?

About 1,080 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Main ST over Pecan Creek?

The structure is 122 ft (37.2 m) long with a longest span of 46 ft (14 m) and a deck 36 ft wide.

Who owns Main ST over Pecan Creek?

It is owned by the City or Municipal Highway Agency.