US Bridges

Broadway ST over Pecan Creek

Good

Cooke County, Texas · 0.4 MI W of FM 372 · Structure no. 030490B00110002

Built
2011
14 years old
Condition
Good
inspected April 2023
Type
Other
Prestressed Concrete
Length
116 ft
3 main spans
Daily traffic
4,026
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Broadway ST over Pecan Creek is a prestressed concrete other carrying Broadway ST over Pecan Creek in Cooke County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,026 vehicles a day, roughly 5% of them trucks, projected to reach 10,000 by 2027. The structure is 116 ft (35.4 m) long and 36 ft wide.

CarriesBroadway ST
CrossesPecan Creek
Location0.4 MI W of FM 372
RouteCity Street 204
StateTexas
Coordinates33.62579, -97.13899
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeOther
MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length116 ft (35.4 m)
Longest span43 ft (13.1 m)
Deck width36 ft (11 m)
Roadway width28 ft (8.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,026 (2020)
Projected traffic10,000 by 2027
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$352,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Broadway ST over Pecan Creek built?

It was built in 2011, making it 14 years old in 2025.

What condition is Broadway ST over Pecan Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Broadway ST over Pecan Creek carry?

About 4,026 vehicles per day (2020 count), of which roughly 5% are trucks.

How long is Broadway ST over Pecan Creek?

The structure is 116 ft (35.4 m) long with a longest span of 43 ft (13.1 m) and a deck 36 ft wide.

Who owns Broadway ST over Pecan Creek?

It is owned by the City or Municipal Highway Agency.