US Bridges

Mallard Lakes DR over Trib Wilson Creek

Good

Collin County, Texas · 0.7 MI S of Virginia Pkwy · Structure no. 180430LQ0028001

Built
2006
19 years old
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
30 ft
3 main spans
Daily traffic
168
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Mallard Lakes DR over Trib Wilson Creek is a concrete culvert carrying Mallard Lakes DR over Trib Wilson Creek in Collin County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 168 vehicles a day, roughly 3% of them trucks, projected to reach 168 by 2041. The structure is 30 ft (9.1 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMallard Lakes DR
CrossesTrib Wilson Creek
Location0.7 MI S of Virginia Pkwy
RouteCity Street 0
StateTexas
Coordinates33.18663, -96.67115
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry8: Equal to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length30 ft (9.1 m)
Longest span9 ft (2.7 m)
Deck width60 ft (18.4 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic168 (2021)
Projected traffic168 by 2041
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Mallard Lakes DR over Trib Wilson Creek built?

It was built in 2006, making it 19 years old in 2025.

What condition is Mallard Lakes DR over Trib Wilson Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Mallard Lakes DR over Trib Wilson Creek carry?

About 168 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Mallard Lakes DR over Trib Wilson Creek?

The structure is 30 ft (9.1 m) long with a longest span of 9 ft (2.7 m) and a deck 60 ft wide.

Who owns Mallard Lakes DR over Trib Wilson Creek?

It is owned by the City or Municipal Highway Agency.