US Bridges

Deer Trail over Wilson Creek Tributary

Fair

Collin County, Texas · 0.15 MI SW of Jordan · Structure no. 180430D00297001

Built
1982
43 years old
Condition
Fair
inspected March 2023
Type
Culvert
Concrete
Length
45 ft
3 main spans
Daily traffic
74
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Deer Trail over Wilson Creek Tributary is a concrete culvert carrying Deer Trail over Wilson Creek Tributary in Collin County, Texas. It was built in 1982, so it is 43 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 74 vehicles a day, projected to reach 80 by 2031. The structure is 45 ft (13.7 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesDeer Trail
CrossesWilson Creek Tributary
Location0.15 MI SW of Jordan
RouteCity Street 0
StateTexas
Coordinates33.20243, -96.6557
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadUnknown
Structure length45 ft (13.7 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic74 (2022)
Projected traffic80 by 2031
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$22,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Deer Trail over Wilson Creek Tributary built?

It was built in 1982, making it 43 years old in 2025.

What condition is Deer Trail over Wilson Creek Tributary in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Deer Trail over Wilson Creek Tributary carry?

About 74 vehicles per day (2022 count).

How long is Deer Trail over Wilson Creek Tributary?

The structure is 45 ft (13.7 m) long with a longest span of 10 ft (3 m).

Who owns Deer Trail over Wilson Creek Tributary?

It is owned by the City or Municipal Highway Agency.