US Bridges

Teel Parkway over Panther Creek

Good

Collin County, Texas · 1.2 MI S of US 380 · Structure no. 180430J00520007

Built
2019
6 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
665 ft
7 main spans
Daily traffic
2,985
2015 count
Owner
City
City or Municipal Highway Agency

About this bridge

Teel Parkway over Panther Creek is a prestressed concrete stringer/multi-beam or girder carrying Teel Parkway over Panther Creek in Collin County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,985 vehicles a day, roughly 3% of them trucks, projected to reach 5,430 by 2037. The structure is 665 ft (202.7 m) long and 39 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTeel Parkway
CrossesPanther Creek
Location1.2 MI S of US 380
RouteCity Street 0
StateTexas
Coordinates33.20562, -96.86871
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans7
Design loadHL 93
Structure length665 ft (202.7 m)
Longest span95 ft (29 m)
Deck width39 ft (11.9 m)
Roadway width28 ft (8.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,985 (2015)
Projected traffic5,430 by 2037
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Teel Parkway over Panther Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Teel Parkway over Panther Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Teel Parkway over Panther Creek carry?

About 2,985 vehicles per day (2015 count), of which roughly 3% are trucks.

How long is Teel Parkway over Panther Creek?

The structure is 665 ft (202.7 m) long with a longest span of 95 ft (29 m) and a deck 39 ft wide.

Who owns Teel Parkway over Panther Creek?

It is owned by the City or Municipal Highway Agency.