US Bridges

Teel Pkwy over Trib Doe Branch

Good

Denton County, Texas · 0.2 MI N Os US 183 · Structure no. 180610LT4301002

Built
2017
8 years old, rebuilt 2024
Condition
Good
inspected June 2024
Type
Culvert
Concrete
Length
64 ft
6 main spans
Daily traffic
4,000
2020 count
Owner
Town / Township
Town or Township Highway Agency

About this bridge

Teel Pkwy over Trib Doe Branch is a concrete culvert carrying Teel Pkwy over Trib Doe Branch in Denton County, Texas. It was built in 2017 and reconstructed in 2024, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 4,000 vehicles a day, roughly 3% of them trucks, projected to reach 9,000 by 2040. The structure is 64 ft (19.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTeel Pkwy
CrossesTrib Doe Branch
Location0.2 MI N Os US 183
RouteCity Street 0
StateTexas
Coordinates33.22236, -96.86074
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans6
Design loadHL 93
Structure length64 ft (19.5 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic4,000 (2020)
Projected traffic9,000 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerTown or Township Highway Agency
Maintained byTown or Township Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Teel Pkwy over Trib Doe Branch built?

It was built in 2017, making it 8 years old in 2025. It was reconstructed in 2024.

What condition is Teel Pkwy over Trib Doe Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Teel Pkwy over Trib Doe Branch carry?

About 4,000 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Teel Pkwy over Trib Doe Branch?

The structure is 64 ft (19.5 m) long with a longest span of 10 ft (3 m).

Who owns Teel Pkwy over Trib Doe Branch?

It is owned by the Town or Township Highway Agency.