Eldorado Pkwy EB over Panther Creek
FairCollin County, Texas · 0.2 MI E of Preston Road · Structure no. 180430J00520003
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 240 ft
- 3 main spans
- Daily traffic
- 10,579
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Eldorado Pkwy EB over Panther Creek is a prestressed concrete stringer/multi-beam or girder carrying Eldorado Pkwy EB over Panther Creek in Collin County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,579 vehicles a day, projected to reach 3,000 by 2031. The structure is 240 ft (73.2 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Eldorado Pkwy EB over Panther Creek built?
It was built in 2005, making it 20 years old in 2025.
What condition is Eldorado Pkwy EB over Panther Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Eldorado Pkwy EB over Panther Creek carry?
About 10,579 vehicles per day (2019 count).
How long is Eldorado Pkwy EB over Panther Creek?
The structure is 240 ft (73.2 m) long with a longest span of 80 ft (24.4 m) and a deck 45 ft wide.
Who owns Eldorado Pkwy EB over Panther Creek?
It is owned by the City or Municipal Highway Agency.