SH 289 over Panther Creek Relief
FairCollin County, Texas · 2.75 MI S of US 380 · Structure no. 180430009104073
- Built
- 2005
- 20 years old, rebuilt 2010
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 117 ft
- 1 main span
- Daily traffic
- 35,804
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
SH 289 over Panther Creek Relief is a prestressed concrete stringer/multi-beam or girder carrying SH 289 over Panther Creek Relief in Collin County, Texas. It was built in 2005 and reconstructed in 2010, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 35,804 vehicles a day, roughly 1% of them trucks, projected to reach 31,888 by 2040. The structure is 117 ft (35.7 m) long and 110 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 289 over Panther Creek Relief built?
It was built in 2005, making it 20 years old in 2025. It was reconstructed in 2010.
What condition is SH 289 over Panther Creek Relief in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does SH 289 over Panther Creek Relief carry?
About 35,804 vehicles per day (2022 count), of which roughly 1% are trucks.
How long is SH 289 over Panther Creek Relief?
The structure is 117 ft (35.7 m) long with a longest span of 117 ft (35.7 m) and a deck 110 ft wide.
Who owns SH 289 over Panther Creek Relief?
It is owned by the State Highway Agency.