Bois Darc Lane over Turner Branch
GoodCollin County, Texas · 0.10 MI S of FM 2514 · Structure no. 180430CC0115001
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected February 2023
- Type
- Frame
- Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 60
- 2011 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Bois Darc Lane over Turner Branch is a concrete frame carrying Bois Darc Lane over Turner Branch in Collin County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60 vehicles a day, roughly 2% of them trucks, projected to reach 100 by 2031. The structure is 45 ft (13.7 m) long and 32 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Bois Darc Lane over Turner Branch built?
It was built in 1998, making it 27 years old in 2025.
What condition is Bois Darc Lane over Turner Branch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2023.
How much traffic does Bois Darc Lane over Turner Branch carry?
About 60 vehicles per day (2011 count), of which roughly 2% are trucks.
How long is Bois Darc Lane over Turner Branch?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 32 ft wide.
Who owns Bois Darc Lane over Turner Branch?
It is owned by the City or Municipal Highway Agency.