US Bridges

FM 2514 over Turner Branch

Good

Collin County, Texas · 5.1 MI N of SH 78 · Structure no. 180430267902013

Built
2019
6 years old
Condition
Good
inspected October 2023
Type
Culvert
Concrete
Length
22 ft
2 main spans
Daily traffic
12,696
2020 count
Owner
State
State Highway Agency

About this bridge

FM 2514 over Turner Branch is a concrete culvert carrying FM 2514 over Turner Branch in Collin County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,696 vehicles a day, roughly 6% of them trucks, projected to reach 17,774 by 2040. The structure is 22 ft (6.7 m) long and 152 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFM 2514
CrossesTurner Branch
Location5.1 MI N of SH 78
RouteState Highway 2514
StateTexas
Coordinates33.05509, -96.59246
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert8 Very GoodNo problems noted.
Last inspectionOctober 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length22 ft (6.7 m)
Longest span9 ft (2.7 m)
Deck width152 ft (46.4 m)
Roadway width58 ft (17.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,696 (2020)
Projected traffic17,774 by 2040
Trucks6%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was FM 2514 over Turner Branch built?

It was built in 2019, making it 6 years old in 2025.

What condition is FM 2514 over Turner Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does FM 2514 over Turner Branch carry?

About 12,696 vehicles per day (2020 count), of which roughly 6% are trucks.

How long is FM 2514 over Turner Branch?

The structure is 22 ft (6.7 m) long with a longest span of 9 ft (2.7 m) and a deck 152 ft wide.

Who owns FM 2514 over Turner Branch?

It is owned by the State Highway Agency.