US Bridges

Eldorado Pkwy over US 75

Fair

Collin County, Texas · At Int Eldo Pkwy & US 75 · Structure no. 180430004706629

Built
2017
8 years old
Condition
Fair
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
297 ft
2 main spans
Daily traffic
25,380
2016 count
Owner
State
State Highway Agency

About this bridge

Eldorado Pkwy over US 75 is a prestressed concrete stringer/multi-beam or girder carrying Eldorado Pkwy over US 75 in Collin County, Texas. It was built in 2017, so it is 8 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25,380 vehicles a day, roughly 10% of them trucks, projected to reach 44,770 by 2035. The structure is 297 ft (90.5 m) long and 119 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesEldorado Pkwy
CrossesUS 75
LocationAt Int Eldo Pkwy & US 75
RouteCity Street 0
StateTexas
Coordinates33.17188, -96.64077
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+2 approach)
Design loadHL 93
Structure length297 ft (90.5 m)
Longest span112 ft (34.1 m)
Deck width119 ft (36.3 m)
Roadway width88 ft (26.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25,380 (2016)
Projected traffic44,770 by 2035
Trucks10%
Lanes on structure7
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Eldorado Pkwy over US 75 built?

It was built in 2017, making it 8 years old in 2025.

What condition is Eldorado Pkwy over US 75 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.

How much traffic does Eldorado Pkwy over US 75 carry?

About 25,380 vehicles per day (2016 count), of which roughly 10% are trucks.

How long is Eldorado Pkwy over US 75?

The structure is 297 ft (90.5 m) long with a longest span of 112 ft (34.1 m) and a deck 119 ft wide.

Who owns Eldorado Pkwy over US 75?

It is owned by the State Highway Agency.