US Bridges

El Dorado N T/A over US 75

Good

Collin County, Texas · 3.1 MI S of US 380 · Structure no. 180430004706628

Built
2014
11 years old
Condition
Good
inspected October 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
298 ft
2 main spans
Daily traffic
12,799
2019 count
Owner
State
State Highway Agency

About this bridge

El Dorado N T/A over US 75 is a prestressed concrete stringer/multi-beam or girder carrying El Dorado N T/A over US 75 in Collin County, Texas. It was built in 2014, so it is 11 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 12,799 vehicles a day, projected to reach 10,000 by 2034. The structure is 298 ft (90.8 m) long and 55 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesEl Dorado N T/A
CrossesUS 75
Location3.1 MI S of US 380
RouteCity Street 0
StateTexas
Coordinates33.17239, -96.64107
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionOctober 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+2 approach)
Design loadHL 93
Structure length298 ft (90.8 m)
Longest span112 ft (34.1 m)
Deck width55 ft (16.7 m)
Roadway width20 ft (6.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic12,799 (2019)
Projected traffic10,000 by 2034
Trucks0%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was El Dorado N T/A over US 75 built?

It was built in 2014, making it 11 years old in 2025.

What condition is El Dorado N T/A over US 75 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.

How much traffic does El Dorado N T/A over US 75 carry?

About 12,799 vehicles per day (2019 count).

How long is El Dorado N T/A over US 75?

The structure is 298 ft (90.8 m) long with a longest span of 112 ft (34.1 m) and a deck 55 ft wide.

Who owns El Dorado N T/A over US 75?

It is owned by the State Highway Agency.