US Bridges

FAU 2807 297753C over Cnic Railroad

Good

Shelby County, Tennessee · South Parkway E.-Memphis · Structure no. 79K28070001

Built
2007
18 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
206 ft
3 main spans
Daily traffic
5,423
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

FAU 2807 297753C over Cnic Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying FAU 2807 297753C over Cnic Railroad in Shelby County, Tennessee. It was built in 2007, so it is 18 years old, younger than the Tennessee average of 47.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,423 vehicles a day, roughly 4% of them trucks, projected to reach 7,182 by 2042. The structure is 206 ft (62.9 m) long and 66 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesFAU 2807 297753C
CrossesCnic Railroad
LocationSouth Parkway E.-Memphis
RouteCity Street 2807
Coordinates35.10769, -90.05818
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating84.3 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length206 ft (62.9 m)
Longest span80 ft (24.4 m)
Deck width66 ft (20.1 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,423 (2021)
Projected traffic7,182 by 2042
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was FAU 2807 297753C over Cnic Railroad built?

It was built in 2007, making it 18 years old in 2025.

What condition is FAU 2807 297753C over Cnic Railroad in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does FAU 2807 297753C over Cnic Railroad carry?

About 5,423 vehicles per day (2021 count), of which roughly 4% are trucks.

How long is FAU 2807 297753C over Cnic Railroad?

The structure is 206 ft (62.9 m) long with a longest span of 80 ft (24.4 m) and a deck 66 ft wide.

Who owns FAU 2807 297753C over Cnic Railroad?

It is owned by the City or Municipal Highway Agency.