FAU 2861 297545B over Cnic Railroad
FairShelby County, Tennessee · E. Mclemore ST - Memphis · Structure no. 790B2800003
- Built
- 2005
- 20 years old
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 452 ft
- 6 main spans
- Daily traffic
- 6,995
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
FAU 2861 297545B over Cnic Railroad is a prestressed concrete continuous stringer/multi-beam or girder carrying FAU 2861 297545B over Cnic Railroad in Shelby County, Tennessee. It was built in 2005, so it is 20 years old, younger than the Tennessee average of 47.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 6,995 vehicles a day, roughly 4% of them trucks, projected to reach 10,128 by 2041. The structure is 452 ft (137.7 m) long and 52 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was FAU 2861 297545B over Cnic Railroad built?
It was built in 2005, making it 20 years old in 2025.
What condition is FAU 2861 297545B over Cnic Railroad in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does FAU 2861 297545B over Cnic Railroad carry?
About 6,995 vehicles per day (2021 count), of which roughly 4% are trucks.
How long is FAU 2861 297545B over Cnic Railroad?
The structure is 452 ft (137.7 m) long with a longest span of 76 ft (23.2 m) and a deck 52 ft wide.
Who owns FAU 2861 297545B over Cnic Railroad?
It is owned by the City or Municipal Highway Agency.