US Bridges

IRR BIA RTE 3 over Veo Creek

Good

Dewey County, South Dakota · 16 KM East of Whitehorse · Structure no. 0000A01340B0004

Built
2016
9 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
76 ft
1 main span
Daily traffic
550
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 3 over Veo Creek is a steel stringer/multi-beam or girder carrying IRR BIA RTE 3 over Veo Creek in Dewey County, South Dakota. It was built in 2016, so it is 9 years old, younger than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 550 vehicles a day, roughly 5% of them trucks, projected to reach 644 by 2043. The structure is 76 ft (23.2 m) long and 32 ft wide. If it were closed, the detour would be 68.4 mi (110 km).

CarriesIRR BIA RTE 3
CrossesVeo Creek
Location16 KM East of Whitehorse
RouteFederal Lands Road 3
Coordinates45.32483, -100.72217
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating70.4 US tons
Inventory rating54.1 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length76 ft (23.2 m)
Longest span74 ft (22.6 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic550 (2023)
Projected traffic644 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed68.4 mi (110 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 3 over Veo Creek built?

It was built in 2016, making it 9 years old in 2025.

What condition is IRR BIA RTE 3 over Veo Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IRR BIA RTE 3 over Veo Creek carry?

About 550 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 3 over Veo Creek?

The structure is 76 ft (23.2 m) long with a longest span of 74 ft (22.6 m) and a deck 32 ft wide.

Who owns IRR BIA RTE 3 over Veo Creek?

It is owned by the Bureau of Indian Affairs.