US Bridges

IRR BIA RTE 3 over Hand Boy Creek

Fair

Dewey County, South Dakota · 3.2KM W of RTE 7 Junction · Structure no. 00000000000A005

Built
1964
61 years old
Condition
Fair
inspected May 2023
Type
Channel Beam
Concrete
Length
94 ft
3 main spans
Daily traffic
200
2023 count
Owner
Federal
Bureau of Indian Affairs

About this bridge

IRR BIA RTE 3 over Hand Boy Creek is a concrete channel beam carrying IRR BIA RTE 3 over Hand Boy Creek in Dewey County, South Dakota. It was built in 1964, so it is 61 years old, older than the South Dakota average of 48.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 234 by 2043. The structure is 94 ft (28.7 m) long and 32 ft wide. If it were closed, the detour would be 67.7 mi (109 km).

CarriesIRR BIA RTE 3
CrossesHand Boy Creek
Location3.2KM W of RTE 7 Junction
RouteFederal Lands Road 3
Coordinates45.34081, -100.65528
Functional classRural Minor Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating45 US tons
Inventory rating34 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckConcrete, precast panels
Main spans3
Design loadH 20
Structure length94 ft (28.7 m)
Longest span31 ft (9.4 m)
Deck width32 ft (9.7 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2023)
Projected traffic234 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed67.7 mi (109 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerBureau of Indian Affairs
Maintained byBureau of Indian Affairs
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR BIA RTE 3 over Hand Boy Creek built?

It was built in 1964, making it 61 years old in 2025.

What condition is IRR BIA RTE 3 over Hand Boy Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does IRR BIA RTE 3 over Hand Boy Creek carry?

About 200 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is IRR BIA RTE 3 over Hand Boy Creek?

The structure is 94 ft (28.7 m) long with a longest span of 31 ft (9.4 m) and a deck 32 ft wide.

Who owns IRR BIA RTE 3 over Hand Boy Creek?

It is owned by the Bureau of Indian Affairs.