US Bridges

_PR-345 to PR-2 over _

Good

Hormigueros Municipio, Puerto Rico · _1.93 KM SE Hormigueros · Structure no. 029601

Built
2013
12 years old
Condition
Good
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
297 ft
3 main spans
Daily traffic
8,900
2005 count
Owner
State
State Highway Agency

About this bridge

_PR-345 to PR-2 over _ is a prestressed concrete stringer/multi-beam or girder carrying _PR-345 to PR-2 over _ in Hormigueros Municipio, Puerto Rico. It was built in 2013, so it is 12 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 8,900 vehicles a day, roughly 5% of them trucks, projected to reach 7,744 by 2020. The structure is 297 ft (90.6 m) long and 26 ft wide.

Carries_PR-345 to PR-2
Crosses_
Location_1.93 KM SE Hormigueros
RouteState Highway 2
Coordinates18.3825, -67.20924
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment3: Basically intolerable, requiring high priority of corrective action
Operating rating73.9 US tons
Inventory rating56.2 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length297 ft (90.6 m)
Longest span101 ft (30.7 m)
Deck width26 ft (7.9 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic8,900 (2005)
Projected traffic7,744 by 2020
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was _PR-345 to PR-2 over _ built?

It was built in 2013, making it 12 years old in 2025.

What condition is _PR-345 to PR-2 over _ in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.

How much traffic does _PR-345 to PR-2 over _ carry?

About 8,900 vehicles per day (2005 count), of which roughly 5% are trucks.

How long is _PR-345 to PR-2 over _?

The structure is 297 ft (90.6 m) long with a longest span of 101 ft (30.7 m) and a deck 26 ft wide.

Who owns _PR-345 to PR-2 over _?

It is owned by the State Highway Agency.