Pr 100 SB 0.8 KM over Guanajibo River
FairHormigueros Municipio, Puerto Rico · 1.5 KM W of Hormigueros · Structure no. 014712
- Built
- 1976
- 49 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 793 ft
- 6 main spans
- Daily traffic
- 10,100
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 100 SB 0.8 KM over Guanajibo River is a prestressed concrete stringer/multi-beam or girder carrying Pr 100 SB 0.8 KM over Guanajibo River in Hormigueros Municipio, Puerto Rico. It was built in 1976, so it is 49 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,100 vehicles a day, roughly 5% of them trucks, projected to reach 13,950 by 2025. The structure is 793 ft (241.7 m) long and 51 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 100 SB 0.8 KM over Guanajibo River built?
It was built in 1976, making it 49 years old in 2025.
What condition is Pr 100 SB 0.8 KM over Guanajibo River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Pr 100 SB 0.8 KM over Guanajibo River carry?
About 10,100 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 100 SB 0.8 KM over Guanajibo River?
The structure is 793 ft (241.7 m) long with a longest span of 128 ft (39.1 m) and a deck 51 ft wide.
Who owns Pr 100 SB 0.8 KM over Guanajibo River?
It is owned by the State Highway Agency.