US Bridges

Pr 100 over Pr 114

Good

Hormigueros Municipio, Puerto Rico · Pr 100 Northbound · Structure no. 028852

Built
2013
12 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
95 ft
1 main span
Daily traffic
10,100
2017 count
Owner
State
State Highway Agency

About this bridge

Pr 100 over Pr 114 is a prestressed concrete stringer/multi-beam or girder carrying Pr 100 over Pr 114 in Hormigueros Municipio, Puerto Rico. It was built in 2013, so it is 12 years old, younger than the Puerto Rico average of 51.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,100 vehicles a day, roughly 5% of them trucks, projected to reach 13,950 by 2025. The structure is 95 ft (29.1 m) long and 44 ft wide.

CarriesPr 100
CrossesPr 114
LocationPr 100 Northbound
RouteState Highway 100
Coordinates18.14307, -67.146
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating64.6 US tons
Inventory rating49.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length95 ft (29.1 m)
Longest span95 ft (29.1 m)
Deck width44 ft (13.3 m)
Roadway width39 ft (11.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,100 (2017)
Projected traffic13,950 by 2025
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pr 100 over Pr 114 built?

It was built in 2013, making it 12 years old in 2025.

What condition is Pr 100 over Pr 114 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Pr 100 over Pr 114 carry?

About 10,100 vehicles per day (2017 count), of which roughly 5% are trucks.

How long is Pr 100 over Pr 114?

The structure is 95 ft (29.1 m) long with a longest span of 95 ft (29.1 m) and a deck 44 ft wide.

Who owns Pr 100 over Pr 114?

It is owned by the State Highway Agency.