Pr 375 9.35 KM over Grande Creek
FairYauco Municipio, Puerto Rico · 7 Kms of Yauco · Structure no. 027271
- Built
- 2003
- 22 years old
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 34 ft
- 1 main span
- Daily traffic
- 1,000
- 2017 count
- Owner
- County
- County Highway Agency
About this bridge
Pr 375 9.35 KM over Grande Creek is a steel stringer/multi-beam or girder carrying Pr 375 9.35 KM over Grande Creek in Yauco Municipio, Puerto Rico. It was built in 2003, so it is 22 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,000 vehicles a day, projected to reach 1,300 by 2025. The structure is 34 ft (10.4 m) long and 20 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 375 9.35 KM over Grande Creek built?
It was built in 2003, making it 22 years old in 2025.
What condition is Pr 375 9.35 KM over Grande Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Pr 375 9.35 KM over Grande Creek carry?
About 1,000 vehicles per day (2017 count).
How long is Pr 375 9.35 KM over Grande Creek?
The structure is 34 ft (10.4 m) long with a longest span of 28 ft (8.5 m) and a deck 20 ft wide.
Who owns Pr 375 9.35 KM over Grande Creek?
It is owned by the County Highway Agency.