Off Pr 178 KM 0.7 over Nigua River
FairPosted for loadArroyo Municipio, Puerto Rico · 1 Km. Southeast of Arroyo · Structure no. 026471
- Built
- 2000
- 25 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 132 ft
- 2 main spans
- Daily traffic
- 7,500
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 178 KM 0.7 over Nigua River is a steel stringer/multi-beam or girder carrying Off Pr 178 KM 0.7 over Nigua River in Arroyo Municipio, Puerto Rico. It was built in 2000, so it is 25 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 7,500 vehicles a day, roughly 5% of them trucks, projected to reach 9,800 by 2025. The structure is 132 ft (40.2 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 178 KM 0.7 over Nigua River built?
It was built in 2000, making it 25 years old in 2025.
What condition is Off Pr 178 KM 0.7 over Nigua River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Off Pr 178 KM 0.7 over Nigua River carry?
About 7,500 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Off Pr 178 KM 0.7 over Nigua River?
The structure is 132 ft (40.2 m) long with a longest span of 64 ft (19.6 m) and a deck 68 ft wide.
Who owns Off Pr 178 KM 0.7 over Nigua River?
It is owned by the City or Municipal Highway Agency.