Pr 3 132.5 KM over Nigua River
FairArroyo Municipio, Puerto Rico · 1 KM East Int PR178 & · Structure no. 017371
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 109 ft
- 2 main spans
- Daily traffic
- 27,700
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 3 132.5 KM over Nigua River is a prestressed concrete stringer/multi-beam or girder carrying Pr 3 132.5 KM over Nigua River in Arroyo Municipio, Puerto Rico. It was built in 1981, so it is 44 years old, younger than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,700 vehicles a day, roughly 4% of them trucks, projected to reach 38,200 by 2025. The structure is 109 ft (33.3 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 3 132.5 KM over Nigua River built?
It was built in 1981, making it 44 years old in 2025.
What condition is Pr 3 132.5 KM over Nigua River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Pr 3 132.5 KM over Nigua River carry?
About 27,700 vehicles per day (2017 count), of which roughly 4% are trucks.
How long is Pr 3 132.5 KM over Nigua River?
The structure is 109 ft (33.3 m) long with a longest span of 52 ft (15.8 m) and a deck 58 ft wide.
Who owns Pr 3 132.5 KM over Nigua River?
It is owned by the State Highway Agency.