Pr 753 over Irrigation Channel
FairPosted for loadArroyo Municipio, Puerto Rico · South of Int Pr 753 & · Structure no. 005271
- Built
- 1948
- 77 years old, rebuilt 1983
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 44 ft
- 1 main span
- Daily traffic
- 10,300
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
Pr 753 over Irrigation Channel is a steel stringer/multi-beam or girder carrying Pr 753 over Irrigation Channel in Arroyo Municipio, Puerto Rico. It was built in 1948 and reconstructed in 1983, so it is 77 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10,300 vehicles a day, roughly 5% of them trucks, projected to reach 14,800 by 2025. The structure is 44 ft (13.3 m) long and 35 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pr 753 over Irrigation Channel built?
It was built in 1948, making it 77 years old in 2025. It was reconstructed in 1983.
What condition is Pr 753 over Irrigation Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Pr 753 over Irrigation Channel carry?
About 10,300 vehicles per day (2017 count), of which roughly 5% are trucks.
How long is Pr 753 over Irrigation Channel?
The structure is 44 ft (13.3 m) long with a longest span of 39 ft (12 m) and a deck 35 ft wide.
Who owns Pr 753 over Irrigation Channel?
It is owned by the State Highway Agency.