PoorClosed to trafficArroyo Municipio, Puerto Rico · 3 KM North of Arroyo · Structure no. 013261
- Built
- 1955
- 70 years old, rebuilt 1998
- Condition
- Poor
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 84 ft
- 1 main span
- Daily traffic
- 100
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Off Pr 753 4.1 KM over Majagual Creek is a steel stringer/multi-beam or girder carrying Off Pr 753 4.1 KM over Majagual Creek in Arroyo Municipio, Puerto Rico. It was built in 1955 and reconstructed in 1998, so it is 70 years old, older than the Puerto Rico average of 51.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. Its operating status is: closed to all traffic.
It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 1,400 by 2025. The structure is 84 ft (25.7 m) long and 28 ft wide. If it were closed, the detour would be 75.2 mi (121 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Off Pr 753 4.1 KM over Majagual Creek built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1998.
What condition is Off Pr 753 4.1 KM over Majagual Creek in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Off Pr 753 4.1 KM over Majagual Creek carry?
About 100 vehicles per day (2017 count), of which roughly 2% are trucks.
How long is Off Pr 753 4.1 KM over Majagual Creek?
The structure is 84 ft (25.7 m) long with a longest span of 80 ft (24.3 m) and a deck 28 ft wide.
Who owns Off Pr 753 4.1 KM over Majagual Creek?
It is owned by the City or Municipal Highway Agency.