T-816 Crumb Road over Clear Shade Creek
GoodSomerset County, Pennsylvania · 3 Mi. S.W. of Ogletown · Structure no. 000000000048896
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 49 ft
- 1 main span
- Daily traffic
- 25
- 2024 count
- Owner
- County
- County Highway Agency
About this bridge
T-816 Crumb Road over Clear Shade Creek is a prestressed concrete box beam or girders - multiple carrying T-816 Crumb Road over Clear Shade Creek in Somerset County, Pennsylvania. It was built in 2014, so it is 11 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 25 vehicles a day, projected to reach 38 by 2044. The structure is 49 ft (14.9 m) long and 18 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-816 Crumb Road over Clear Shade Creek built?
It was built in 2014, making it 11 years old in 2025.
What condition is T-816 Crumb Road over Clear Shade Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does T-816 Crumb Road over Clear Shade Creek carry?
About 25 vehicles per day (2024 count).
How long is T-816 Crumb Road over Clear Shade Creek?
The structure is 49 ft (14.9 m) long with a longest span of 47 ft (14.3 m) and a deck 18 ft wide.
Who owns T-816 Crumb Road over Clear Shade Creek?
It is owned by the County Highway Agency.