T-773 Crescent DR over Clear Shade Creek
FairSomerset County, Pennsylvania · Village of Ogletown · Structure no. 000000000031877
- Built
- 1992
- 33 years old, rebuilt 2022
- Condition
- Fair
- inspected May 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 100
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
T-773 Crescent DR over Clear Shade Creek is a prestressed concrete box beam or girders - multiple carrying T-773 Crescent DR over Clear Shade Creek in Somerset County, Pennsylvania. It was built in 1992 and reconstructed in 2022, so it is 33 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 100 vehicles a day, roughly 1% of them trucks, projected to reach 140 by 2043. The structure is 45 ft (13.7 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was T-773 Crescent DR over Clear Shade Creek built?
It was built in 1992, making it 33 years old in 2025. It was reconstructed in 2022.
What condition is T-773 Crescent DR over Clear Shade Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does T-773 Crescent DR over Clear Shade Creek carry?
About 100 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is T-773 Crescent DR over Clear Shade Creek?
The structure is 45 ft (13.7 m) long with a longest span of 43 ft (13.1 m) and a deck 32 ft wide.
Who owns T-773 Crescent DR over Clear Shade Creek?
It is owned by the County Highway Agency.