US Bridges

I-95 (nb & Sb) over Sergeant & Huntingdon ST

Good

Philadelphia County, Pennsylvania · Nr.Aramingo Ave. 3591B05 · Structure no. 000000000057314

Built
2019
6 years old
Condition
Good
inspected July 2022
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
1,430 ft
11 main spans
Daily traffic
147,295
2023 count
Owner
State
State Highway Agency

About this bridge

I-95 (nb & Sb) over Sergeant & Huntingdon ST is a prestressed concrete continuous stringer/multi-beam or girder carrying I-95 (nb & Sb) over Sergeant & Huntingdon ST in Philadelphia County, Pennsylvania. It was built in 2019, so it is 6 years old, younger than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 147,295 vehicles a day, roughly 7% of them trucks, projected to reach 255,528 by 2032. The structure is 1,430 ft (435.9 m) long and 182 ft wide. If it were closed, the detour would be 8.7 mi (14 km).

CarriesI-95 (nb & Sb)
CrossesSergeant & Huntingdon ST
LocationNr.Aramingo Ave. 3591B05
RouteInterstate 95
Coordinates39.97551, -75.11564
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure9 ExcellentNo problems noted.
Last inspectionJuly 2022
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating40 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans11
Design loadHL 93
Structure length1,430 ft (435.9 m)
Longest span130 ft (39.6 m)
Deck width182 ft (55.5 m)
Roadway width76 ft (23.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic147,295 (2023)
Projected traffic255,528 by 2032
Trucks7%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed8.7 mi (14 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-95 (nb & Sb) over Sergeant & Huntingdon ST built?

It was built in 2019, making it 6 years old in 2025.

What condition is I-95 (nb & Sb) over Sergeant & Huntingdon ST in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2022.

How much traffic does I-95 (nb & Sb) over Sergeant & Huntingdon ST carry?

About 147,295 vehicles per day (2023 count), of which roughly 7% are trucks.

How long is I-95 (nb & Sb) over Sergeant & Huntingdon ST?

The structure is 1,430 ft (435.9 m) long with a longest span of 130 ft (39.6 m) and a deck 182 ft wide.

Who owns I-95 (nb & Sb) over Sergeant & Huntingdon ST?

It is owned by the State Highway Agency.