Ramp Ebu Off 76EB over Dirt Fill
FairPhiladelphia County, Pennsylvania · Universisty Ave. 3589 J10 · Structure no. 000000000039387
- Built
- 1956
- 69 years old, rebuilt 1984
- Condition
- Fair
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 437 ft
- 8 main spans
- Daily traffic
- 11,567
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Ramp Ebu Off 76EB over Dirt Fill is a steel stringer/multi-beam or girder carrying Ramp Ebu Off 76EB over Dirt Fill in Philadelphia County, Pennsylvania. It was built in 1956 and reconstructed in 1984, so it is 69 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,567 vehicles a day, roughly 7% of them trucks, projected to reach 13,591 by 2032. The structure is 437 ft (133.2 m) long and 36 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Ramp Ebu Off 76EB over Dirt Fill built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 1984.
What condition is Ramp Ebu Off 76EB over Dirt Fill in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does Ramp Ebu Off 76EB over Dirt Fill carry?
About 11,567 vehicles per day (2024 count), of which roughly 7% are trucks.
How long is Ramp Ebu Off 76EB over Dirt Fill?
The structure is 437 ft (133.2 m) long with a longest span of 56 ft (17.1 m) and a deck 36 ft wide.
Who owns Ramp Ebu Off 76EB over Dirt Fill?
It is owned by the State Highway Agency.