Schuylkill Ewy. WB over Pile Supported Slab
FairPhiladelphia County, Pennsylvania · Vine St.Interch. 3590A07 · Structure no. 000000000038484
- Built
- 1987
- 38 years old
- Condition
- Fair
- inspected March 2023
- Type
- Slab
- Concrete
- Length
- 1,188 ft
- 161 main spans
- Daily traffic
- 73,769
- 2020 count
- Owner
- State
- State Highway Agency
About this bridge
Schuylkill Ewy. WB over Pile Supported Slab is a concrete slab carrying Schuylkill Ewy. WB over Pile Supported Slab in Philadelphia County, Pennsylvania. It was built in 1987, so it is 38 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 73,769 vehicles a day, roughly 7% of them trucks, projected to reach 91,631 by 2032. The structure is 1,188 ft (362.1 m) long and 43 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Schuylkill Ewy. WB over Pile Supported Slab built?
It was built in 1987, making it 38 years old in 2025.
What condition is Schuylkill Ewy. WB over Pile Supported Slab in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Schuylkill Ewy. WB over Pile Supported Slab carry?
About 73,769 vehicles per day (2020 count), of which roughly 7% are trucks.
How long is Schuylkill Ewy. WB over Pile Supported Slab?
The structure is 1,188 ft (362.1 m) long with a longest span of 12 ft (3.7 m) and a deck 43 ft wide.
Who owns Schuylkill Ewy. WB over Pile Supported Slab?
It is owned by the State Highway Agency.