Greenland Drive over Schuylkill Exwy
FairPhiladelphia County, Pennsylvania · W.STRWBRY.MNSN.BRG3589J01 · Structure no. 000000000038456
- Built
- 1972
- 53 years old, rebuilt 2001
- Condition
- Fair
- inspected March 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 258 ft
- 2 main spans
- Daily traffic
- 15,156
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
Greenland Drive over Schuylkill Exwy is a steel continuous stringer/multi-beam or girder carrying Greenland Drive over Schuylkill Exwy in Philadelphia County, Pennsylvania. It was built in 1972 and reconstructed in 2001, so it is 53 years old, younger than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,156 vehicles a day, roughly 8% of them trucks, projected to reach 14,806 by 2032. The structure is 258 ft (78.6 m) long and 56 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Greenland Drive over Schuylkill Exwy built?
It was built in 1972, making it 53 years old in 2025. It was reconstructed in 2001.
What condition is Greenland Drive over Schuylkill Exwy in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.
How much traffic does Greenland Drive over Schuylkill Exwy carry?
About 15,156 vehicles per day (2024 count), of which roughly 8% are trucks.
How long is Greenland Drive over Schuylkill Exwy?
The structure is 258 ft (78.6 m) long with a longest span of 127 ft (38.7 m) and a deck 56 ft wide.
Who owns Greenland Drive over Schuylkill Exwy?
It is owned by the State Highway Agency.