SR 80 Eb/Wb & Ramp over Hogback Run

Good

Mercer County, Pennsylvania · Shenango Township · Structure no. 000000000025774

Built
1966
59 years old, rebuilt 2020
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
25 ft
1 main span
Daily traffic
26,925
2024 count
Owner
State
State Highway Agency

About this bridge

SR 80 Eb/Wb & Ramp over Hogback Run is a concrete culvert carrying SR 80 Eb/Wb & Ramp over Hogback Run in Mercer County, Pennsylvania. It was built in 1966 and reconstructed in 2020, so it is 59 years old, older than the Pennsylvania average of 54.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 26,925 vehicles a day, roughly 43% of them trucks, projected to reach 36,244 by 2032. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 8.1 mi (13 km).

CarriesSR 80 Eb/Wb & Ramp
CrossesHogback Run
LocationShenango Township
RouteInterstate 80
Coordinates41.18466, -80.44085
Functional classRural Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating98.9 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 20
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26,925 (2024)
Projected traffic36,244 by 2032
Trucks43%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed8.1 mi (13 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SR 80 Eb/Wb & Ramp over Hogback Run built?

It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2020.

What condition is SR 80 Eb/Wb & Ramp over Hogback Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SR 80 Eb/Wb & Ramp over Hogback Run carry?

About 26,925 vehicles per day (2024 count), of which roughly 43% are trucks.

How long is SR 80 Eb/Wb & Ramp over Hogback Run?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).

Who owns SR 80 Eb/Wb & Ramp over Hogback Run?

It is owned by the State Highway Agency.