I 376 WB over SR 80 EB & WB
FairMercer County, Pennsylvania · Shenango Township · Structure no. 000000000025692
- Built
- 1966
- 59 years old, rebuilt 2020
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 360 ft
- 5 main spans
- Daily traffic
- 7,660
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
I 376 WB over SR 80 EB & WB is a prestressed concrete stringer/multi-beam or girder carrying I 376 WB over SR 80 EB & WB in Mercer County, Pennsylvania. It was built in 1966 and reconstructed in 2020, so it is 59 years old, older than the Pennsylvania average of 54.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 7,660 vehicles a day, roughly 12% of them trucks, projected to reach 11,700 by 2032. The structure is 360 ft (109.7 m) long and 50 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 376 WB over SR 80 EB & WB built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2020.
What condition is I 376 WB over SR 80 EB & WB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I 376 WB over SR 80 EB & WB carry?
About 7,660 vehicles per day (2024 count), of which roughly 12% are trucks.
How long is I 376 WB over SR 80 EB & WB?
The structure is 360 ft (109.7 m) long with a longest span of 90 ft (27.4 m) and a deck 50 ft wide.
Who owns I 376 WB over SR 80 EB & WB?
It is owned by the State Highway Agency.