US Bridges

Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD

Fair

Polk County, Oregon · Center ST in Salem · Structure no. 22523030AZ02569

Built
1953
72 years old, rebuilt 1984
Condition
Fair
inspected September 2023
Type
Tee Beam
Concrete
Length
805 ft
13 main spans
Daily traffic
45,083
2022 count
Owner
State
State Highway Agency

About this bridge

Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD is a concrete tee beam carrying Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD in Polk County, Oregon. It was built in 1953 and reconstructed in 1984, so it is 72 years old, older than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 45,083 vehicles a day, roughly 8% of them trucks, projected to reach 53,300 by 2042. The structure is 805 ft (245.4 m) long and 27 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOr 22 (HWY30AZ) E
CrossesHWY 150 Conn. & Park RD
LocationCenter ST in Salem
RouteState Highway 22
StateOregon
Coordinates44.94528, -123.04716
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation3: Basically intolerable, requiring high priority of corrective action
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating16.4 US tons
Inventory rating12.5 US tons

Structure

Structure typeTee Beam
MaterialConcrete
DeckConcrete, cast-in-place
Main spans13
Design loadHS 20
Structure length805 ft (245.4 m)
Longest span85 ft (25.9 m)
Deck width27 ft (8.1 m)
Roadway width23 ft (7 m)
Vertical clearance over deck18 ft (5.5 m)

Traffic and service

Average daily traffic45,083 (2022)
Projected traffic53,300 by 2042
Trucks8%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD built?

It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1984.

What condition is Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD carry?

About 45,083 vehicles per day (2022 count), of which roughly 8% are trucks.

How long is Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD?

The structure is 805 ft (245.4 m) long with a longest span of 85 ft (25.9 m) and a deck 27 ft wide.

Who owns Or 22 (HWY30AZ) E over HWY 150 Conn. & Park RD?

It is owned by the State Highway Agency.