Or 22 (hwy 30) EB over Front Street & Pnwr
GoodMarion County, Oregon · Center ST Off Ramp to 72S · Structure no. 00123G030 02600
- Built
- 1977
- 48 years old
- Condition
- Good
- inspected September 2023
- Type
- Box Beam or Girders - Multiple
- Concrete Continuous
- Length
- 278 ft
- 5 main spans
- Daily traffic
- 17,013
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Or 22 (hwy 30) EB over Front Street & Pnwr is a concrete continuous box beam or girders - multiple carrying Or 22 (hwy 30) EB over Front Street & Pnwr in Marion County, Oregon. It was built in 1977, so it is 48 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 17,013 vehicles a day, roughly 3% of them trucks, projected to reach 12,400 by 2030. The structure is 278 ft (84.6 m) long and 30 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Or 22 (hwy 30) EB over Front Street & Pnwr built?
It was built in 1977, making it 48 years old in 2025.
What condition is Or 22 (hwy 30) EB over Front Street & Pnwr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does Or 22 (hwy 30) EB over Front Street & Pnwr carry?
About 17,013 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is Or 22 (hwy 30) EB over Front Street & Pnwr?
The structure is 278 ft (84.6 m) long with a longest span of 63 ft (19.2 m) and a deck 30 ft wide.
Who owns Or 22 (hwy 30) EB over Front Street & Pnwr?
It is owned by the State Highway Agency.