US Bridges

NW Everett over B-128 1st to Front Ave

Good

Multnomah County, Oregon · NW Everett ST @ NW 1st Av · Structure no. 25B128000000000

Built
1986
39 years old
Condition
Good
inspected May 2023
Type
Slab
Prestressed Concrete
Length
176 ft
7 main spans
Daily traffic
7,203
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

NW Everett over B-128 1st to Front Ave is a prestressed concrete slab carrying NW Everett over B-128 1st to Front Ave in Multnomah County, Oregon. It was built in 1986, so it is 39 years old, younger than the Oregon average of 49.9 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 7,203 vehicles a day, roughly 10% of them trucks, projected to reach 9,853 by 2025. The structure is 176 ft (53.6 m) long and 30 ft wide.

CarriesNW Everett
CrossesB-128 1st to Front Ave
LocationNW Everett ST @ NW 1st Av
RouteCity Street 9314
StateOregon
Coordinates45.52626, -122.67133
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating26.8 US tons
Inventory rating20.7 US tons

Structure

Structure typeSlab
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans7
Design loadHS 20
Structure length176 ft (53.6 m)
Longest span25 ft (7.6 m)
Deck width30 ft (9 m)
Roadway width16 ft (4.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,203 (2020)
Projected traffic9,853 by 2025
Trucks10%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesOther
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$902,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was NW Everett over B-128 1st to Front Ave built?

It was built in 1986, making it 39 years old in 2025.

What condition is NW Everett over B-128 1st to Front Ave in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does NW Everett over B-128 1st to Front Ave carry?

About 7,203 vehicles per day (2020 count), of which roughly 10% are trucks.

How long is NW Everett over B-128 1st to Front Ave?

The structure is 176 ft (53.6 m) long with a longest span of 25 ft (7.6 m) and a deck 30 ft wide.

Who owns NW Everett over B-128 1st to Front Ave?

It is owned by the City or Municipal Highway Agency.