Steel Bridge Ramp over B-128D Everett Complex
FairMultnomah County, Oregon · E of NW 1st Ave/Max (lrt) · Structure no. 25128D0025B128D
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected October 2023
- Type
- Slab
- Concrete Continuous
- Length
- 127 ft
- 7 main spans
- Daily traffic
- 8,287
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Steel Bridge Ramp over B-128D Everett Complex is a concrete continuous slab carrying Steel Bridge Ramp over B-128D Everett Complex in Multnomah County, Oregon. It was built in 1986, so it is 39 years old, younger than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,287 vehicles a day, roughly 1% of them trucks, projected to reach 10,447 by 2025. The structure is 127 ft (38.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Steel Bridge Ramp over B-128D Everett Complex built?
It was built in 1986, making it 39 years old in 2025.
What condition is Steel Bridge Ramp over B-128D Everett Complex in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does Steel Bridge Ramp over B-128D Everett Complex carry?
About 8,287 vehicles per day (2020 count), of which roughly 1% are trucks.
How long is Steel Bridge Ramp over B-128D Everett Complex?
The structure is 127 ft (38.7 m) long with a longest span of 24 ft (7.3 m) and a deck 30 ft wide.
Who owns Steel Bridge Ramp over B-128D Everett Complex?
It is owned by the City or Municipal Highway Agency.