HWY 1W/GLISAN Ramp over Front Ave & UPRR
FairPosted for loadMultnomah County, Oregon · At NW End of Steel Br. · Structure no. 06683A01WX00031
- Built
- 1950
- 75 years old, rebuilt 1985
- Condition
- Fair
- inspected August 2023
- Type
- Girder and Floorbeam System
- Steel
- Length
- 505 ft
- 9 main spans
- Daily traffic
- 2,630
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY 1W/GLISAN Ramp over Front Ave & UPRR is a steel girder and floorbeam system carrying HWY 1W/GLISAN Ramp over Front Ave & UPRR in Multnomah County, Oregon. It was built in 1950 and reconstructed in 1985, so it is 75 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 2,630 vehicles a day, roughly 3% of them trucks, projected to reach 9,801 by 2027. The structure is 505 ft (153.9 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY 1W/GLISAN Ramp over Front Ave & UPRR built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 1985.
What condition is HWY 1W/GLISAN Ramp over Front Ave & UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does HWY 1W/GLISAN Ramp over Front Ave & UPRR carry?
About 2,630 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is HWY 1W/GLISAN Ramp over Front Ave & UPRR?
The structure is 505 ft (153.9 m) long with a longest span of 102 ft (31.1 m) and a deck 56 ft wide.
Who owns HWY 1W/GLISAN Ramp over Front Ave & UPRR?
It is owned by the State Highway Agency.