Hy 1 NB to Hy 2 over UPRR & Conn 6
FairMultnomah County, Oregon · 0.1 MI N of Burnside Br · Structure no. 08588D001 30150
- Built
- 1963
- 62 years old, rebuilt 1995
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,564 ft
- 9 main spans
- Daily traffic
- 44,376
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Hy 1 NB to Hy 2 over UPRR & Conn 6 is a steel stringer/multi-beam or girder carrying Hy 1 NB to Hy 2 over UPRR & Conn 6 in Multnomah County, Oregon. It was built in 1963 and reconstructed in 1995, so it is 62 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 44,376 vehicles a day, roughly 7% of them trucks, projected to reach 35,600 by 2040. The structure is 1,564 ft (476.7 m) long and 37 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hy 1 NB to Hy 2 over UPRR & Conn 6 built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1995.
What condition is Hy 1 NB to Hy 2 over UPRR & Conn 6 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Hy 1 NB to Hy 2 over UPRR & Conn 6 carry?
About 44,376 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Hy 1 NB to Hy 2 over UPRR & Conn 6?
The structure is 1,564 ft (476.7 m) long with a longest span of 146 ft (44.5 m) and a deck 37 ft wide.
Who owns Hy 1 NB to Hy 2 over UPRR & Conn 6?
It is owned by the State Highway Agency.