Burnside ST over East Burnside Approach
FairPosted for loadMultnomah County, Oregon · East End Burnside Br · Structure no. 00511B932600000
- Built
- 1927
- 98 years old
- Condition
- Fair
- inspected June 2023
- Type
- Girder and Floorbeam System
- Steel Continuous
- Length
- 859 ft
- 8 main spans
- Daily traffic
- 58,691
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
Burnside ST over East Burnside Approach is a steel continuous girder and floorbeam system carrying Burnside ST over East Burnside Approach in Multnomah County, Oregon. It was built in 1927, so it is 98 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 58,691 vehicles a day, roughly 10% of them trucks, projected to reach 88,033 by 2025. The structure is 859 ft (261.8 m) long and 86 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Burnside ST over East Burnside Approach built?
It was built in 1927, making it 98 years old in 2025.
What condition is Burnside ST over East Burnside Approach in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Burnside ST over East Burnside Approach carry?
About 58,691 vehicles per day (2020 count), of which roughly 10% are trucks.
How long is Burnside ST over East Burnside Approach?
The structure is 859 ft (261.8 m) long with a longest span of 108 ft (32.9 m) and a deck 86 ft wide.
Who owns Burnside ST over East Burnside Approach?
It is owned by the County Highway Agency.