Hy 2 WB to Hy 1 NB over UPRR
FairMultnomah County, Oregon · 0.5 MI E Portland Cc · Structure no. 08588A002 00024
- Built
- 1963
- 62 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 1,524 ft
- 10 main spans
- Daily traffic
- 71,767
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
Hy 2 WB to Hy 1 NB over UPRR is a steel stringer/multi-beam or girder carrying Hy 2 WB to Hy 1 NB over UPRR in Multnomah County, Oregon. It was built in 1963, so it is 62 years old, older than the Oregon average of 49.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 71,767 vehicles a day, roughly 7% of them trucks, projected to reach 75,000 by 2042. The structure is 1,524 ft (464.5 m) long and 26 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Hy 2 WB to Hy 1 NB over UPRR built?
It was built in 1963, making it 62 years old in 2025.
What condition is Hy 2 WB to Hy 1 NB over UPRR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does Hy 2 WB to Hy 1 NB over UPRR carry?
About 71,767 vehicles per day (2022 count), of which roughly 7% are trucks.
How long is Hy 2 WB to Hy 1 NB over UPRR?
The structure is 1,524 ft (464.5 m) long with a longest span of 197 ft (59.9 m) and a deck 26 ft wide.
Who owns Hy 2 WB to Hy 1 NB over UPRR?
It is owned by the State Highway Agency.