US Bridges

Pine St. over Will Rogers Tp I-44 Und

Good

Rogers County, Oklahoma · Mm 1.47 Wrt · Structure no. 260820000000000

Built
2000
25 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
219 ft
2 main spans
Daily traffic
2,000
2022 count
Owner
Toll Authority
State Toll Authority

About this bridge

Pine St. over Will Rogers Tp I-44 Und is a prestressed concrete continuous stringer/multi-beam or girder carrying Pine St. over Will Rogers Tp I-44 Und in Rogers County, Oklahoma. It was built in 2000, so it is 25 years old, younger than the Oklahoma average of 47.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 5% of them trucks, projected to reach 3,200 by 2042. The structure is 219 ft (66.6 m) long and 55 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesPine St.
CrossesWill Rogers Tp I-44 Und
LocationMm 1.47 Wrt
RouteCity Street 0
Coordinates36.17689, -95.73167
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating110.1 US tons
Inventory rating24.4 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length219 ft (66.6 m)
Longest span110 ft (33.5 m)
Deck width55 ft (16.8 m)
Roadway width49 ft (15 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2022)
Projected traffic3,200 by 2042
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$1.5 million
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pine St. over Will Rogers Tp I-44 Und built?

It was built in 2000, making it 25 years old in 2025.

What condition is Pine St. over Will Rogers Tp I-44 Und in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Pine St. over Will Rogers Tp I-44 Und carry?

About 2,000 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is Pine St. over Will Rogers Tp I-44 Und?

The structure is 219 ft (66.6 m) long with a longest span of 110 ft (33.5 m) and a deck 55 ft wide.

Who owns Pine St. over Will Rogers Tp I-44 Und?

It is owned by the State Toll Authority.