CR 30A over Over WAY-250-1236L
GoodWayne County, Ohio · Under WAY-C.R.30A-11.52 · Structure no. 8502056
- Built
- 1978
- 47 years old
- Condition
- Good
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 208 ft
- 4 main spans
- Daily traffic
- 6,501
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
CR 30A over Over WAY-250-1236L is a steel continuous stringer/multi-beam or girder carrying CR 30A over Over WAY-250-1236L in Wayne County, Ohio. It was built in 1978, so it is 47 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 6,501 vehicles a day, roughly 6% of them trucks, projected to reach 2,060 by 2035. The structure is 208 ft (63.4 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 30A over Over WAY-250-1236L built?
It was built in 1978, making it 47 years old in 2025.
What condition is CR 30A over Over WAY-250-1236L in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does CR 30A over Over WAY-250-1236L carry?
About 6,501 vehicles per day (2015 count), of which roughly 6% are trucks.
How long is CR 30A over Over WAY-250-1236L?
The structure is 208 ft (63.4 m) long with a longest span of 64 ft (19.5 m) and a deck 46 ft wide.
Who owns CR 30A over Over WAY-250-1236L?
It is owned by the State Highway Agency.