Trimble Road over Toubys Run & Bikeway
GoodRichland County, Ohio · 0.2MI N of Park Ave SR430 · Structure no. 7061412
- Built
- 1966
- 59 years old, rebuilt 1994
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 257 ft
- 4 main spans
- Daily traffic
- 13,392
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Trimble Road over Toubys Run & Bikeway is a steel continuous stringer/multi-beam or girder carrying Trimble Road over Toubys Run & Bikeway in Richland County, Ohio. It was built in 1966 and reconstructed in 1994, so it is 59 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 13,392 vehicles a day, roughly 7% of them trucks, projected to reach 18,588 by 2035. The structure is 257 ft (78.3 m) long and 52 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Trimble Road over Toubys Run & Bikeway built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 1994.
What condition is Trimble Road over Toubys Run & Bikeway in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does Trimble Road over Toubys Run & Bikeway carry?
About 13,392 vehicles per day (2015 count), of which roughly 7% are trucks.
How long is Trimble Road over Toubys Run & Bikeway?
The structure is 257 ft (78.3 m) long with a longest span of 70 ft (21.3 m) and a deck 52 ft wide.
Who owns Trimble Road over Toubys Run & Bikeway?
It is owned by the City or Municipal Highway Agency.