Road Around Lake over North Lake Headwaters
PoorRichland County, Ohio · 0.02 MI N of JCT Hope RD · Structure no. 7062622
- Built
- 2021
- 4 years old
- Condition
- Poor
- inspected June 2023
- Type
- Arch - Deck
- Concrete
- Length
- 30 ft
- 1 main span
- Daily traffic
- 172
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Road Around Lake over North Lake Headwaters is a concrete arch - deck carrying Road Around Lake over North Lake Headwaters in Richland County, Ohio. It was built in 2021, so it is 4 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 172 vehicles a day, roughly 6% of them trucks, projected to reach 193 by 2039. The structure is 30 ft (9.1 m) long and 30 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Road Around Lake over North Lake Headwaters built?
It was built in 2021, making it 4 years old in 2025.
What condition is Road Around Lake over North Lake Headwaters in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in June 2023.
How much traffic does Road Around Lake over North Lake Headwaters carry?
About 172 vehicles per day (2019 count), of which roughly 6% are trucks.
How long is Road Around Lake over North Lake Headwaters?
The structure is 30 ft (9.1 m) long with a longest span of 30 ft (9.1 m) and a deck 30 ft wide.
Who owns Road Around Lake over North Lake Headwaters?
It is owned by the City or Municipal Highway Agency.