US Bridges

Friday Lane over Touby Run

Fair

Richland County, Ohio · 880 Ft W of Home Road · Structure no. 7064535

Built
1984
41 years old
Condition
Fair
inspected June 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
30 ft
1 main span
Daily traffic
100
1984 count
Owner
City
City or Municipal Highway Agency

About this bridge

Friday Lane over Touby Run is a prestressed concrete box beam or girders - multiple carrying Friday Lane over Touby Run in Richland County, Ohio. It was built in 1984, so it is 41 years old, younger than the Ohio average of 47.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 100 vehicles a day, roughly 2% of them trucks, projected to reach 139 by 2004. The structure is 30 ft (9.1 m) long and 36 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFriday Lane
CrossesTouby Run
Location880 Ft W of Home Road
RouteCity Street 876
StateOhio
Coordinates40.76314, -82.57451
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment9: Superior to present desirable criteria
Operating rating75 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckOther
Main spans1
Design loadHS 20
Structure length30 ft (9.1 m)
Longest span29 ft (8.8 m)
Deck width36 ft (11 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic100 (1984)
Projected traffic139 by 2004
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Friday Lane over Touby Run built?

It was built in 1984, making it 41 years old in 2025.

What condition is Friday Lane over Touby Run in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does Friday Lane over Touby Run carry?

About 100 vehicles per day (1984 count), of which roughly 2% are trucks.

How long is Friday Lane over Touby Run?

The structure is 30 ft (9.1 m) long with a longest span of 29 ft (8.8 m) and a deck 36 ft wide.

Who owns Friday Lane over Touby Run?

It is owned by the City or Municipal Highway Agency.