Salem Avenue over Great Miami River
FairMontgomery County, Ohio · .12MI West of JCT IR-75 · Structure no. 5761212
- Built
- 1951
- 74 years old, rebuilt 2001
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 683 ft
- 5 main spans
- Daily traffic
- 21,587
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Salem Avenue over Great Miami River is a steel continuous stringer/multi-beam or girder carrying Salem Avenue over Great Miami River in Montgomery County, Ohio. It was built in 1951 and reconstructed in 2001, so it is 74 years old, older than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,587 vehicles a day, roughly 8% of them trucks, projected to reach 7,021 by 2036. The structure is 683 ft (208.2 m) long and 96 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salem Avenue over Great Miami River built?
It was built in 1951, making it 74 years old in 2025. It was reconstructed in 2001.
What condition is Salem Avenue over Great Miami River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Salem Avenue over Great Miami River carry?
About 21,587 vehicles per day (2019 count), of which roughly 8% are trucks.
How long is Salem Avenue over Great Miami River?
The structure is 683 ft (208.2 m) long with a longest span of 140 ft (42.7 m) and a deck 96 ft wide.
Who owns Salem Avenue over Great Miami River?
It is owned by the County Highway Agency.