IR-75 over Monument Miami R. Rvw DR
GoodMontgomery County, Ohio · .1MI.N. of Jct. First ST · Structure no. 5707994
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,453 ft
- 10 main spans
- Daily traffic
- 114,744
- 2015 count
- Owner
- State
- State Highway Agency
About this bridge
IR-75 over Monument Miami R. Rvw DR is a prestressed concrete stringer/multi-beam or girder carrying IR-75 over Monument Miami R. Rvw DR in Montgomery County, Ohio. It was built in 2014, so it is 11 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 114,744 vehicles a day, roughly 14% of them trucks, projected to reach 159,265 by 2035. The structure is 1,453 ft (442.9 m) long and 175 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IR-75 over Monument Miami R. Rvw DR built?
It was built in 2014, making it 11 years old in 2025.
What condition is IR-75 over Monument Miami R. Rvw DR in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.
How much traffic does IR-75 over Monument Miami R. Rvw DR carry?
About 114,744 vehicles per day (2015 count), of which roughly 14% are trucks.
How long is IR-75 over Monument Miami R. Rvw DR?
The structure is 1,453 ft (442.9 m) long with a longest span of 165 ft (50.2 m) and a deck 175 ft wide.
Who owns IR-75 over Monument Miami R. Rvw DR?
It is owned by the State Highway Agency.