I-75NB Rmp C1-2nd over Third St. CR-194A
GoodMontgomery County, Ohio · 0.25MI. N. of Jct. SR-4 · Structure no. 5707854
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 149 ft
- 1 main span
- Daily traffic
- 20,100
- 2005 count
- Owner
- State
- State Highway Agency
About this bridge
I-75NB Rmp C1-2nd over Third St. CR-194A is a prestressed concrete stringer/multi-beam or girder carrying I-75NB Rmp C1-2nd over Third St. CR-194A in Montgomery County, Ohio. It was built in 2016, so it is 9 years old, younger than the Ohio average of 47.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 20,100 vehicles a day, roughly 3% of them trucks, projected to reach 23,316 by 2025. The structure is 149 ft (45.3 m) long and 41 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 9 Excellent | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-75NB Rmp C1-2nd over Third St. CR-194A built?
It was built in 2016, making it 9 years old in 2025.
What condition is I-75NB Rmp C1-2nd over Third St. CR-194A in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2023.
How much traffic does I-75NB Rmp C1-2nd over Third St. CR-194A carry?
About 20,100 vehicles per day (2005 count), of which roughly 3% are trucks.
How long is I-75NB Rmp C1-2nd over Third St. CR-194A?
The structure is 149 ft (45.3 m) long with a longest span of 142 ft (43.4 m) and a deck 41 ft wide.
Who owns I-75NB Rmp C1-2nd over Third St. CR-194A?
It is owned by the State Highway Agency.